As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is

Post by answerhappygod »

As The Production Planner For Xiangling Hu Products Inc You Have Been Given A Bill Of Material For A Bracket That Is 1
As The Production Planner For Xiangling Hu Products Inc You Have Been Given A Bill Of Material For A Bracket That Is 1 (106.9 KiB) Viewed 51 times
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Bracket Number Item || Base (1) ||| IV Clamp (4) Clamp (1) Handle Casting (1) Handle (1) III Bearing(2) II IV I
b) Determine the gross quantities needed of each item if you are to assemble 50 brackets. Click the icon to view the completed product structure. Base: 50 units (enter your response as a whole number). Spring: 100 units (enter your response as a whole number). Clamp: 250 units (enter your response as a whole number). Housing: 100 units (enter your response as a whole number). Handle: 250 units (enter your response as a whole number). Casting: 250 units (enter your response as a whole number). Bearing: 200 units (enter your response as a whole number). Shaft: 100 units (enter your response as a whole number). c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock. Base: 25 units (enter your response as a whole number). Spring: 100 units (enter your response as a whole number). Clamp: 125 units (enter your response as a whole number). Housing: 50 units (enter your response as a whole number). Handle: 125 units (enter your response as a whole number). Casting: 125 units (enter your response as a whole number). Bearing: 100 units (enter your response as a whole number). Shaft: 50 units (enter your response as a whole number).