Approximate service time calculations (assume 6 min. per vehicle, 15 stations) Assume 25 feet per vehicle. Concept inclu

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Approximate service time calculations (assume 6 min. per vehicle, 15 stations) Assume 25 feet per vehicle. Concept inclu

Post by answerhappygod »

Approximate service time calculations (assume 6 min. per
vehicle, 15 stations)
Assume 25 feet per vehicle. Concept includes ±4,000 feet of
total queuing (2 lanes @ ±2,000 feet each) from entry point at
street to testing station.
• This allows for ___e___ vehicles that can queue (___f__ feet/
__g__ feet per vehicle)
• Once filled, the last vehicle in the queue would have an
approximate __h___ minute wait time
Explain how you came up with this number
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply