1. Estimate the cost of the next spread footings. The soil capacity is 6 KSF. The project will be in New York City, New

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

1. Estimate the cost of the next spread footings. The soil capacity is 6 KSF. The project will be in New York City, New

Post by answerhappygod »

1 Estimate The Cost Of The Next Spread Footings The Soil Capacity Is 6 Ksf The Project Will Be In New York City New 1
1 Estimate The Cost Of The Next Spread Footings The Soil Capacity Is 6 Ksf The Project Will Be In New York City New 1 (127.05 KiB) Viewed 40 times
1. Estimate the cost of the next spread footings. The soil capacity is 6 KSF. The project will be in New York City, New York. 12 spread footings with a loading capacity of 500 kips each ● 20 spread footings with a loading capacity of 300 kips each ● 8 spread footings with a loading capacity of 150 kips each 2. Estimate the cost of a reinforced slab on grade, 120' long, 56' wide, 6" thick, nonindustrial, in Chicago, Illinois. 3. Estimate the cost of a CIP waffle slab, 20' x 25' bays, 40 PSF superimposed load. Total area is 100' x 50'. The building will be located in Phoenix, Arizona. 4. Estimate the cost of a standard exterior CMU block, 8" x 16" x 8" with two coats cement stucco, 5%" thick. The wall is 8' high and 80' long, located in Miami, Florida. Add the following items to the estimate in Exercise: • Precast lintel, 4' long, 4" wide, 8" high, prestressed, 4 each Precast lintel, 4' long, 6" wide, 8" high, prestressed, 4 each Remember that you need to create two separate estimates (one for items and one for assemblies) and then merge them. 5. What is the cost of providing and installing 10 steel doors, 18 gauge hollow metal, single door, with frame, no label, 3' x 7' opening? The building is located in Nashville, Tennessee.