7. Given the following information on a shovel/truck operation. determine the number of bucket loads and the number of t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

7. Given the following information on a shovel/truck operation. determine the number of bucket loads and the number of t

Post by answerhappygod »

7. Given the following information on a shovel/truck operation.
determine the number of bucket loads
and the number of trucks at the highest production rate.
1_Shovel has a 3-cy bucket.
2_ Shovel cycle time is 20 sec.
3_Bucket fill factor is 1.05.
4_Job efficiency is 50-min per hour and job condition
unfavorable.
5_Maximum heaped volume of the rear-dump truck is 25 LCY.
6_Maximum payload is 56.000 lb.
7_Material unit weight is 2.650 lb/LCY.
8_Total truck travel time for haul and return is 8 min.