Overhead Variances, Two- And Three-Variance Analyses Oerstman, Inc., uses a standard costing system and develops its ove

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Overhead Variances, Two- And Three-Variance Analyses Oerstman, Inc., uses a standard costing system and develops its ove

Post by answerhappygod »

Overhead Variances Two And Three Variance Analyses Oerstman Inc Uses A Standard Costing System And Develops Its Ove 1
Overhead Variances Two And Three Variance Analyses Oerstman Inc Uses A Standard Costing System And Develops Its Ove 1 (138.11 KiB) Viewed 38 times
Overhead Variances, Two- And Three-Variance Analyses Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 121,000 units requiring 484,000 direct labor hours. (Practical capacity is 504,000 hours.) Annual budgeted overhead costs total $750,200, of which $546,920 is fixed overhead. A total of 119,200 units using 482,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $240,400, and actual fixed overhead costs were $555,600. Required: 1. Compute overhead variances using a two-variance analysis. Budget Variance 802 X Unfavorable Volume Variance $ 2,784 X Unfavorable 2. Compute overhead variances using a three-variance analysis. Spending Variance $ Unfavorable Efficiency Variance Unfavorable Volume Variance Unfavorable