3 4 B B ERT_CSS DER A 2 2 z (bich) A: (0, 0, 0) B: (3', 8', 4) 2" Turbine shaft a 60RPM • BOP shall last at least 20 y

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

3 4 B B ERT_CSS DER A 2 2 z (bich) A: (0, 0, 0) B: (3', 8', 4) 2" Turbine shaft a 60RPM • BOP shall last at least 20 y

Post by answerhappygod »

3 4 B B Ert Css Der A 2 2 Z Bich A 0 0 0 B 3 8 4 2 Turbine Shaft A 60rpm Bop Shall Last At Least 20 Y 1
3 4 B B Ert Css Der A 2 2 Z Bich A 0 0 0 B 3 8 4 2 Turbine Shaft A 60rpm Bop Shall Last At Least 20 Y 1 (32.26 KiB) Viewed 15 times
you still need to provide location and loading at your
proposed supports so the structural team can design the rest of the
support including support structures and foundations)
suppose the whole system are connectted with 4 parts and their
location are showen above and their weight is m1,m2, m3 and m4, can
u help analysis the loading require at different element to
support the whole system with Free body dragram ?
3 4 B B ERT_CSS DER A 2 2

z (bich) A: (0, 0, 0) B: (3', 8', 4) 2" Turbine shaft a 60RPM • BOP shall last at least 20 years of operation (as shown above) while requiring minimal maintenance • Power loss in BOP should be minimized with total power losses in BOP <7.5% of WT power • Cost of components/materials for BOP, excluding structures and foundations, as purchased retail in the US, to be <$5K • BOP not to impose additional mechanical loads on WT or G's interfaces except for weight and torque transfer related loading • Structures to support BOP components and how it connects to BOP component (e.g. bearings, etc.), to be designed, procured and installed by other teams (you still need to provide location and loading at your proposed supports so the structural team can design the rest of the support including support structures and foundations) 1.5"diam. Generator shaft a 900RPM 4'-0" 8'-0" 3'-0" X
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply