Page 1 of 1

An engineer has decided that an soil sample is suitable to use in sub-base layer. Estimate the CBR values at 0.1" and 0.

Posted: Thu Apr 28, 2022 8:41 pm
by answerhappygod
An Engineer Has Decided That An Soil Sample Is Suitable To Use In Sub Base Layer Estimate The Cbr Values At 0 1 And 0 1
An Engineer Has Decided That An Soil Sample Is Suitable To Use In Sub Base Layer Estimate The Cbr Values At 0 1 And 0 1 (19.85 KiB) Viewed 28 times
An Engineer Has Decided That An Soil Sample Is Suitable To Use In Sub Base Layer Estimate The Cbr Values At 0 1 And 0 2
An Engineer Has Decided That An Soil Sample Is Suitable To Use In Sub Base Layer Estimate The Cbr Values At 0 1 And 0 2 (13.29 KiB) Viewed 28 times
An engineer has decided that an soil sample is suitable to use in sub-base layer. Estimate the CBR values at 0.1" and 0.2" for this soil sample according to his decision (2 points) O 15% and 25% respective test should be rpeated 25% and 15% respectively O 55% and 25% respectively
7. A CBR test produced a CBR value of 25% @0.1" and a CBR value of 15% @ 02", the tested sample is suitable to use in: (2 Points) a base layer test should be peated O sub-baselayer surface