16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = iz
Posted: Thu Apr 28, 2022 8:33 pm
please help me sketching EGL and HGL for this problem
(Ks for the ductile iron pipes is 0.0004 ft in case needed)
I calculated the Power of the pump to be 168.5 horsepower.
16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = izats Pipe 1 L = 6000ft Pipea L=12000 ft D = 1.25ft RESERVON B Pipe 3 L = 8000ft D = 1.5ft b=1.5ft
(Ks for the ductile iron pipes is 0.0004 ft in case needed)
I calculated the Power of the pump to be 168.5 horsepower.
16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = izats Pipe 1 L = 6000ft Pipea L=12000 ft D = 1.25ft RESERVON B Pipe 3 L = 8000ft D = 1.5ft b=1.5ft