Question 1. (60 points) Find Formwork. Rebor, Concrete quantities for (6) spread (aka, Isolated or adfootings on 101 Foundation Plan for the Albany Carousel Museum. The footings in questionaried to any other foundation clement. Asume 3-inch cover Mark Oy Formwork Rear Concrete Total 6 Question 1A Find Concrete (volume only) for the section of the continuous footing between the two red lines and identified as "Typical Foundation Wall in the drawing below. Include all concrete below the stab but not the slab itself nor the stab at the bottom of the pit. HSS FULL.HT Question 2 points) What structural element is supported by the special footings in Question !? Question 3. (35 points) a) Find square footage of concrete sidewalk surrounding the building include sidewalk up to the curvy existing curb to the west and up to the existing street light now the road tracks to the north 20 points) b) How many new "Street Trees are included in this project poi c) How many handicap accessible parking spets are included in this project? points) 4) Is the building in the Albany Historic District points) c) What are the dimensions of a typical parking spot? points) D) How many hike racks are included in this project points)
GENERAL NOTES STORICAL CAROUSEL ANDA LO CA THE NW WATER AVE CONSTRUCTION NOTES G 00000000 OVER EL EXIT SW WASHINGTON ST EXIT 10 EX De De Dood Do Do Do DODOD DS WAVE WEST 1 AVE
CAL Alfa SE PARA CONCRETE TE LO O AL SH LEGEND PAD POOTING SCHEDULE w SOU TO LEGY Lal Y LOW To ONE OBAT VARIOS
- CONT TYP (2) CONT TYP TAPID GLB HUBE PLATE BOLTS FOR DETAIL CONCHETE FERPLATYP V. PODLE LS TOTAL DE CONCRETE NOTYPE METAL DOORS WHO UPLOOD FLOOR SHEATING ZL.U. SCAD TEO CON PEDESTAL WAP CLOSE WELD STOF CONT SVET FLOOR OTO METRO VESTIDORES MOTO C G -8). VENT DES DOO MTOTO NA FACE PER ARO YA MORE TO COCA PER FAH CONT WATERTO NA LONGCONT re
CARISO RAFT -BEARING HALL FOOTING PER PLAN FOUNDATION WALL @ BEARING WALL Ver COM 2- CONCRETE SLAB W. OC EA HAY TOP & BOTTOM DOHL 0 OC - CONCRETE SLAD HOC EXY CR DDD ALBANY CAROUSEL AND MUSEUM SOSWASTAVE CLR vine - TIS 6 CONCRETE SLAD oc EA RAY CONCRETE WALL Hoc EAWAY DINIO SLAB 01.2018 13113 TYPICAL SECTION @ LIFT ROD PIT e by ON
Question 1. (60 points) Find Formwork. Rebor, Concrete quantities for (6) spread (aka, Isolated or adfootings on 101 Fou
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Question 1. (60 points) Find Formwork. Rebor, Concrete quantities for (6) spread (aka, Isolated or adfootings on 101 Fou
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!