PLEASE SHOW ALL STEPS
A 10-m by 20-m mudmat foundation will be placed on the seabed. The submerged unit weight of the seafloor soil is 6.5 kN/m². The upper 5m of the deposit has a uniform pre- consolidation stress o'p = 32.5 kPa. Below 5 m, the soil is normally consolidated. The compression and swell indices are Cc=0.5 and Cs=0.05. The initial void ratio of the soil is eo = 1.49. Compute the consolidation settlement at the center of the mudmat. Total Load P= 850 kN op=32.5 kPa 5 m 0'=6.6z (kPa)
A 10-m by 20-m mudmat foundation will be placed on the seabed. The submerged unit weight of the seafloor soil is 6.5 kN/
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
A 10-m by 20-m mudmat foundation will be placed on the seabed. The submerged unit weight of the seafloor soil is 6.5 kN/
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!