Fill-in the weld symbol to indicate to the welder to provide an 8 mm fillet weld, in the field, that is 150 mm long ever
Posted: Thu Apr 28, 2022 8:28 pm
Fill-in the weld symbol to indicate to the welder to provide an 8 mm fillet weld, in the field, that is 150 mm long every 600 mm, staggered, on both sides of the stem of the WT reinforcing an existing W-section EXISTING W460 x 74 WT155 x 79 REINFORCING