DT=0.1 HR 2S/ DT+O (CFS) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 ELEV (FT) 0.0 0.5 1.0 1.5 2.0 2.5

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

DT=0.1 HR 2S/ DT+O (CFS) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 ELEV (FT) 0.0 0.5 1.0 1.5 2.0 2.5

Post by answerhappygod »

Dt 0 1 Hr 2s Dt O Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Elev Ft 0 0 0 5 1 0 1 5 2 0 2 5 1
Dt 0 1 Hr 2s Dt O Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Elev Ft 0 0 0 5 1 0 1 5 2 0 2 5 1 (60.43 KiB) Viewed 82 times
Dt 0 1 Hr 2s Dt O Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Elev Ft 0 0 0 5 1 0 1 5 2 0 2 5 2
Dt 0 1 Hr 2s Dt O Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Elev Ft 0 0 0 5 1 0 1 5 2 0 2 5 2 (32.86 KiB) Viewed 82 times
DT=0.1 HR 2S/ DT+O (CFS) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 ELEV (FT) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 A B с D A B с D A B C D А B с D A B с D А TOTAL DI SCHARGE (CFS) 0 А) 0 A 0 A 5 B 5 B 5 B 5 B 5 B 5 B 5 B 5 B 10 С 10 10 с 10 с 10 10 с 10 с С 10 10 w 0 0 0 om oon on on O 10 UU
6. Route the given hydrograph and determine the stage (feet) and outflow (sts) at various times. 291/DT+01 -201 Il + 12 2S2/DT+02 TIME (HRS) 0.0 STAGE (FT) 0.0 TOT OUT (CFS) 0 0 0 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 INFLOW (CFS) 0 5 5 10 10 10 10 5 5 5 0
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply