Find the asphalt application rate obtained if the volume of asphalt used (standard was 3000 I, asphalt temperature was 1
Posted: Thu Apr 28, 2022 8:26 pm
thats sll that was given
Find the asphalt application rate obtained if the volume of asphalt used (standard was 3000 I, asphalt temperature was 127°C, the spray bar length was 6 m, and the length of road section sprayed was 250 m.