Pipes 1,2,3 and 4 have lengths of 300m, 240m, 210m and 450m all being new cast iron. Pipes 2 and 3 are laid in parallel

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Pipes 1,2,3 and 4 have lengths of 300m, 240m, 210m and 450m all being new cast iron. Pipes 2 and 3 are laid in parallel

Post by answerhappygod »

Pipes 1,2,3 and 4 have lengths of 300m, 240m, 210m and 450m all being new cast iron. Pipes 2 and 3 are laid in parallel both drawing from 1 and discharging into 4. If 1,2 and 4 have diameters of 200mm, 150mm and 250mm, respectively, determine the diameter of 3 when the discharge through the system is 45 liters/sec under a total head loss of 8m. Assume f=0.02.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply