TASKB By referring to BQ Element No 2: Work Below Lowest Floor Finish, explain the process of pricing to estimate the to
Posted: Thu Apr 28, 2022 3:36 pm
TASKB By referring to BQ Element No 2: Work Below Lowest Floor Finish, explain the process of pricing to estimate the total cost of construction operations. ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT ELEMET NO 2: WORK BELOW LOWEST FLOOR FINISH EXCAVATION WORKS A m? n 2 Excavate trench to receive ground beam from reduce level not exceeding 1.50m deep, get out, part return, fill in, ram and remove surplus excavated material from site B m? n 15 Excavate pit to receive column bases from reduce level not exceeding 1.50m deep, get out, part return, fill in, ram and remove surplus excavated material from site FILLING с mº 10 100mm (consolidated thickness) bed of hardcore, spread, levelled and compacted to receive concrete. D m? m? 67 150mm (consolidated thickness) bed of hardcore, spread, levelled and compacted to receive concrete. TO SUMMARY