Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

An activity supervisor makes the following estimates about the probability distribution of her activity duration. Optimi

Post by answerhappygod »

An activity supervisor makes the following estimates about the
probability distribution of her activity duration.
Optimistic duration = 10 days
Most likely duration = 16 days
Pessimistic duration = 25 days
1) What estimate of the expected (mean) activity duration should
the project manager make?
< 15
>= 15 and < 20
>= 20 and < 25
> 25
2) What estimate of the standard deviation of the activity
duration should the project manager make?
< 1
>= 1 and < 2
>= 2 and < 3
>= 3