Find the optimal schedule and the minimum Lmax for the following 04| 1), Pj = 1 | Lmx instance with 7 jobs and 4 machine

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Find the optimal schedule and the minimum Lmax for the following 04| 1), Pj = 1 | Lmx instance with 7 jobs and 4 machine

Post by answerhappygod »

Find The Optimal Schedule And The Minimum Lmax For The Following 04 1 Pj 1 Lmx Instance With 7 Jobs And 4 Machine 1
Find The Optimal Schedule And The Minimum Lmax For The Following 04 1 Pj 1 Lmx Instance With 7 Jobs And 4 Machine 1 (15.77 KiB) Viewed 42 times
NOTE: This is open shop question, do it if you can do otherwise
don't do it. If your answer correct you take LİKE(Upvote), You take
dislike if you do this question dilatorily.
Thanks.
Find the optimal schedule and the minimum Lmax for the following 04| 1), Pj = 1 | Lmx instance with 7 jobs and 4 machines. Jobs 1 0 2 1 3 2 4 2 5 3 6 4 7 5 1) d 6 6 6 7 7 9 9