Find the optimal schedule and the minimum Lmax for the following 04| 1), Pj = 1 | Lmx instance with 7 jobs and 4 machines. Jobs 1 0 2 1 3 2 4 2 5 3 6 4 7 5 1) d 6 6 6 7 7 9 9