04 MS XYZ Company Manufactures Sports bikes and supplies them to the local market A local sub-contracting manufacturer s
Posted: Thu Apr 28, 2022 10:29 am
04 MS XYZ Company Manufactures Sports bikes and supplies them to the local market A local sub-contracting manufacturer supplies the wheers to the MS XYZ Company through a purchase contract The sub-contracting company initially purchases aluminium billets as raw material and manufactures wheels by forming each bilet into wheelnms Both the rims (from ancrean are assembled with spokes, front and rear hubs. Front wheels comprise a front rim, 24 spokes and a front hub Rear wheels comprise a rearm, 24 spokes and rear un Draw the 3 of Material (BOM) tree for the front and rear wheels [4 Marks 00 Referring to table 40 and 40. complete the Material Requirements Planning (MRP) and determine when to Purchase Orders placed for the spokes 26 Marks Table 4) Week 12 13 14 15 10 17 Demand for the bikes 80 70 00 120 100 85 Demand of Front Rim 50 40 30 125 The demand of Roar Rim 70 00 Table 4 () Lead Time Stock on Hand Batch Size PartComponent Bike Front wheel Rear wheel Front Rim Rear Rim Front Hub Rear Hub Spokes 190 110 70 90 170 BD 140 8700 TOO 120 150 150 100 150 100 3.000 Safety Stock 0 100 125 100 100 50 50 1.100 2 1