Page 1 of 1

A proposed building site requires 2,000 CCY of imported fill. A suitable borrow site has been located. The soils there h

Posted: Wed Apr 27, 2022 2:52 pm
by answerhappygod
A proposed building site requires 2,000 CCY of imported fill. A
suitable borrow site has been located. The soils there have a swell
rate of 25% and a shrinkage rate of 12%. How many cubic yards of
soil much be trucked in from the borrow site?