The goal of batch processing is best described by which of the following?
Posted: Wed Sep 06, 2023 9:49 am
Batch sizes should be 5 units each
Single piece flow is optimal
Batches should equal one inventory turn
None of the above
Single piece flow is optimal
Batches should equal one inventory turn
None of the above