Page 1 of 1

Which of the following describes the type of project that would required the DMAIC method?

Posted: Wed Aug 23, 2023 8:37 am
by answerhappygod
Establishment of key measurement systems
Implementation of a simple solution to a known issue
Overhaul of a non-capable, existing process
Incremental reduction of defects, cycle time or cost of a process
Creation of a brand-new, non-existent process

Which Of The Following Describes The Type Of Project Require Dmaic Method
Which Of The Following Describes The Type Of Project Require Dmaic Method (23.14 KiB) Viewed 4632 times