Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be performed before beginning theinstallation?
A. All nodes are configured with the same operating system and version.
B. Network interfaces are configured for public and private traffic.
C. A valid voting disk fileis available on at least one node.
D. Shared storage is available from allservers. E. Each public network interface has its own subnet
Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be p
-
- Site Admin
- Posts: 899566
- Joined: Mon Aug 02, 2021 8:13 am