Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be p

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be p

Post by answerhappygod »

Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be performed before beginning theinstallation?

A. All nodes are configured with the same operating system and version.
B. Network interfaces are configured for public and private traffic.
C. A valid voting disk fileis available on at least one node.
D. Shared storage is available from allservers. E. Each public network interface has its own subnet
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This question has been solved and has 1 reply.

You must be registered to view answers and replies in this topic. Registration is free.


Register Login
 
Post Reply