Page 1 of 1

Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be p

Posted: Sun Jun 11, 2023 3:59 pm
by answerhappygod
Your manager has tasked you with planning an Oracle Grid Infrastructure 12cR1 installation. Which threeactions must be performed before beginning theinstallation?

A. All nodes are configured with the same operating system and version.
B. Network interfaces are configured for public and private traffic.
C. A valid voting disk fileis available on at least one node.
D. Shared storage is available from allservers. E. Each public network interface has its own subnet