Page 1 of 1

Two PowerMax arrays have been configured for replication using SRDF. During a disaster recovery operation, production ha

Posted: Fri May 05, 2023 11:03 am
by answerhappygod
Two PowerMax arrays have been configured for replication using SRDF. During a disaster recovery operation, production has been transferred to the R2 devices at the target site. Which operation begins the transfer of accumulated invalid tracks from the R2s to the R1s while production work continues on the R2s?

A. Failback
B. Failover
C. Resume
D. Update