When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task ove
Posted: Thu Apr 06, 2023 1:25 pm
When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task over a higher priority task, what will occur?
A. Both tasks are automatically- reassigned
B. Both tasks are automatically assigned
C. A warning is displayed and dispatcher confirmation is required
D. The higher priority task is automatically reassigned
A. Both tasks are automatically- reassigned
B. Both tasks are automatically assigned
C. A warning is displayed and dispatcher confirmation is required
D. The higher priority task is automatically reassigned