Page 1 of 1

When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task ove

Posted: Thu Apr 06, 2023 1:25 pm
by answerhappygod
When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task over a higher priority task, what will occur?

A. Both tasks are automatically- reassigned
B. Both tasks are automatically assigned
C. A warning is displayed and dispatcher confirmation is required
D. The higher priority task is automatically reassigned