When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task over a higher priority task, what will occur?
A. Both tasks are automatically- reassigned
B. Both tasks are automatically assigned
C. A warning is displayed and dispatcher confirmation is required
D. The higher priority task is automatically reassigned
When using the dispatcher workspace integration with dynamic scheduling, if a dispatcher drags a lower priority task ove
-
- Site Admin
- Posts: 899559
- Joined: Mon Aug 02, 2021 8:13 am