The Risk Score is calculated by combining all the weights using __________.
Posted: Tue Feb 28, 2023 1:02 pm
The Risk Score is calculated by combining all the weights using __________.
A. an arithmetic mean
B. addition
C. the Risk Score script include
D. a geometric mean
A. an arithmetic mean
B. addition
C. the Risk Score script include
D. a geometric mean