Page 1 of 1

An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The MX700 has seven M

Posted: Tue Jan 17, 2023 7:36 am
by answerhappygod
An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The MX700 has seven MX740c, one MX5016s, two Management Modules (MMs), an LED-Only control panel, two MX9116n in Fabric A, two MX5108n in Fabric B, and two MX5000s in Fabric C.
What is a valid method to perform the initial MX platform configuration?

A. Use a serial DB9 / DB cable
B. Use KVM and racadm setniccfg command from MM configuration menu
C. Use Ethernet front panel port default DHCP address
D. Use QuickSync 2