Page 1 of 1

On an IPD, the contractor joins the group during the design development phase O when the designer is working on the cons

Posted: Wed Apr 27, 2022 1:19 pm
by answerhappygod
On An Ipd The Contractor Joins The Group During The Design Development Phase O When The Designer Is Working On The Cons 1
On An Ipd The Contractor Joins The Group During The Design Development Phase O When The Designer Is Working On The Cons 1 (12.18 KiB) Viewed 28 times
On an IPD, the contractor joins the group during the design development phase O when the designer is working on the construction docs O before the design starts.