Which of the following can you control with the confirmation control key? (Choose two.)
Posted: Thu Nov 10, 2022 6:44 am
Which of the following can you control with the confirmation control key? (Choose two.)
A. The document type for the goods receipt
B. Default reminder levels for outstanding confirmations
C. Whether a confirmation is a prerequisite for a goods receipt
D. The sequence of required confirmations
A. The document type for the goods receipt
B. Default reminder levels for outstanding confirmations
C. Whether a confirmation is a prerequisite for a goods receipt
D. The sequence of required confirmations