You propose an HPE 3PAR StoreServ 8200 array for a customer who needs 900 TiB raw storage space. After the proposal was

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

You propose an HPE 3PAR StoreServ 8200 array for a customer who needs 900 TiB raw storage space. After the proposal was

Post by answerhappygod »

You propose an HPE 3PAR StoreServ 8200 array for a customer who needs 900 TiB raw storage space. After the proposal was created, the customer went through with a competitor acquisition. Now they need to accommodate 1600 TiB.
What should you propose to the customer?

A. Instead of 3PAR StoreServ 8200 2-node configuration, propose an 8400 4-node configuration with the needed amount of drives.
B. Instead of 3PAR StoreServ 8200 2-node configuration, propose an 8400 2-node configuration with a 2-node upgrade and the needed amount of drives.
C. Upgrade the 3PAR StoreServ 8200 2-node configuration with four additional nodes and the needed amount of drives.
D. Upgrade the 3PAR StoreServ 8200 2-node configuration with Data Optimization Software Suite and the needed amount of drives.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This question has been solved and has 1 reply.

You must be registered to view answers and replies in this topic. Registration is free.


Register Login
 
Post Reply