Page 1 of 1

Which group of options is possible in SCM GATP but not in ATP in ECC?

Posted: Fri Aug 26, 2022 10:05 am
by answerhappygod
Which group of options is possible in SCM GATP but not in ATP in ECC?

A. ATP check with checking horizon, ATP check at sublocation level, ATP check at batch level
B. Backorder processing, Automated mass ATP check, ATP check for deliveries
C. Check against ATP time series, Check against forecast, Check against allocation
D. Combined check of basic methods, Ability to trigger multilevel production, Rules-based ATP framework