Page 1 of 1

When creating a new job stream using the Dynamic Workload Console, what are the minimum requirements for a job stream to

Posted: Fri Aug 26, 2022 10:00 am
by answerhappygod
When creating a new job stream using the Dynamic Workload Console, what are the minimum requirements for a job stream to be selected for launch after FINAL job stream introduces a new Plan?

A. RunCycle and at least one job
B. RunCycle and not inDraft mode
C. At least one job and not in Draft mode
D. A scheduled time specified and not in Draft mode