Page 1 of 1

Why does Case Builder show Case Tasks as non interconnected boxes? (Choose two)

Posted: Fri Aug 26, 2022 9:58 am
by answerhappygod
Why does Case Builder show Case Tasks as non interconnected boxes? (Choose two)

A. Tasks are designed to be tools for the case worker
B. Case Builder is not used to model the execution order amongst all tasks
C. They may be initially disconnected but are eventually connected in the Step Editor
D. Connectivity is not needed because all the tasks start automatically when the case is first created E. Tasks have a small adornment to the left of the box that indicates the order or execution that takes place after the case has reached the Ready state