In a production environment,which two mechanisms would be used to trigger anovernight batch using an Algo Batch job stre
Posted: Fri Aug 26, 2022 9:56 am
In a production environment,which two mechanisms would be used to trigger anovernight batch using an Algo Batch job stream? (Choose two.)
A. Cron
B. ABE
C. Control-M
D. RiskWatc
A. Cron
B. ABE
C. Control-M
D. RiskWatc