Bowing the alternatives are being evakuwind by the incremental BCE Allamativo Initial Cost B/C vs. Do Nothing A 10,000 0
Posted: Wed Apr 27, 2022 11:47 am
Bowing the alternatives are being evakuwind by the incremental BCE Allamativo Initial Cost B/C vs. Do Nothing A 10,000 0.80 B 30,000 1 17 С 18,000 1.44 D 24,000 1.38 E 16,000 1 13 13,000 0 48 Selected incremental B/C ratios (for example Avs E could be A-E or E-A) A vs E = 20 Bvs C = 075 B vs D = 133 E vs D = 1.88 Fvs E= 133 Evs C - 400 A vs F = 167 A vs B = 135 Cvs F= 2.40 C vs D = 1 17 Bvs F-124 If the projects are mutually exclusive (using incremental analysis), the best alternative is OD B oc DVS 8:1-35 clute A, F, E, C, D,B AUSF, 1.67 elimele A EVSE 1.33 elinde EVSC 4 clinite E CVD. 1-17 chiudec (0) Е IB Best