Page 1 of 1

In addition to the Logical Configuration Survey (LCS), which document is required prior to manufacturing a Vblock System

Posted: Mon Aug 08, 2022 4:00 pm
by answerhappygod
In addition to the Logical Configuration Survey (LCS), which document is required prior to manufacturing a Vblock System 720?

A. Configuration Reference Guide
B. VCE change control form
C. VCE Vblock Systems Release Certification Matrix
D. EMC bin file request form