Review the exhibit.When the Cluster Metric Load or Cluster Object Load exceeds 100%, what is the next step a vRealize Op
Posted: Sat Aug 06, 2022 7:04 am
Review the exhibit.When the Cluster Metric Load or Cluster Object Load exceeds 100%, what is the next step a vRealize Operations administrator should take?
A. Reduce the vRealize Operations data retention time.
B. Add an additional vRealize Operations data node.
C. Increase vRealize Operations polling time.
D. Remove a vCenter from the vSphere management pack.
A. Reduce the vRealize Operations data retention time.
B. Add an additional vRealize Operations data node.
C. Increase vRealize Operations polling time.
D. Remove a vCenter from the vSphere management pack.