Task must follow task listed below Task Assembly Time (minutes) A 7 B 7 с 14 D 5 E 8 F 7 G 14 H 6 1 5 J 10 K 4 L 13 Tota

Posted: Wed Apr 27, 2022 10:37 am
by answerhappygod
 1
1 (48.79 KiB) Viewed 31 times
Task must follow task listed below Task Assembly Time (minutes) A 7 B 7 с 14 D 5 E 8 F 7 G 14 H 6 1 5 J 10 K 4 L 13 Total Time 100 A A А B B с E, F, G D D 1 H, K,J Toyota wants to develop a precedence diagram for an engine component that requires a total assembly time of 100 minutes. Furthermore, the production schedule requires that 34 units of the engine component to be completed as output from the assembly line each day. Toyota determines that there are 510 productive minutes of work available per day. 1- Draw the precedence diagram 2- Calculate the cycle time 3. Find (Calculate) minimum number of workstations 4- Balance the line by assigning specific assembly tasks to each workstation.