An engineer must perform a pre deployment site survey for a new building in a high-security area. The design must provid
Posted: Fri Jul 22, 2022 5:26 pm
An engineer must perform a pre deployment site survey for a new building in a high-security area. The design must provide a primary signal RSSI of -65 dBm for the clients. Which two requirements complete this design? (Choose two.)
A. HVAC access
B. WLC model
C. site access
D. number of clients
E. AP model
A. HVAC access
B. WLC model
C. site access
D. number of clients
E. AP model