Page 1 of 1

In the context of hierarchical scheduling, a scheduler is configured with a CIR weight of 0. Which of the following stat

Posted: Thu Jul 21, 2022 9:56 pm
by answerhappygod
In the context of hierarchical scheduling, a scheduler is configured with a CIR weight of 0. Which of the following statements is TRUE?

A. The scheduler will be allocated its "within CIR" bandwidth before all other children at the same level have received their "within CIR" bandwidth.
B. The scheduler will be allocated its "within CIR" bandwidth after all other children at the same level have received their "within CIR" bandwidth.
C. The scheduler will be allocated its "within CIR" bandwidth after all other children at all levels have received their "within CIR" bandwidth.
D. The scheduler will not be allocated its "within CIR" bandwidth.