Page 1 of 1

Homework three There are four production wells (P1, P2, P3 and P4) on one side of a straight-line supply boundary. Those

Posted: Tue Apr 26, 2022 7:44 pm
by answerhappygod
Homework Three There Are Four Production Wells P1 P2 P3 And P4 On One Side Of A Straight Line Supply Boundary Those 1
Homework Three There Are Four Production Wells P1 P2 P3 And P4 On One Side Of A Straight Line Supply Boundary Those 1 (41.42 KiB) Viewed 34 times
Homework three There are four production wells (P1, P2, P3 and P4) on one side of a straight-line supply boundary. Those wells work at the same time. The pressure at the supply boundary is Pe. Distance between wells and supply boundary is te. The radius of wells are rw. The other already known conditions are shown in the Figure. (15 marks) T. P1 41 PC 4 P2 92 P3 43 4 P4 44 Supply boundary TW Based on the theory of potential superposition, try to: (1) Write down the formula of potential at supply boundary? (Smarks) (2) Write down the formulas of potential at bottom hole of P1, P2, P3 and P4 separately? (Smarks) (3) Write down the equation set of potential superposition? (Smarks)