Which of these is used when the process has achieved high capability level?
Posted: Thu Jul 14, 2022 1:58 pm
a) Trial control limits
b) Actual control limits
c) Modified control limits
d) Easy control limits
b) Actual control limits
c) Modified control limits
d) Easy control limits