When there is a need to reduce acceptance-sampling or other downstream testing to a minimum when the process can be oper
Posted: Thu Jul 14, 2022 1:53 pm
a) Attributes control chart
b) Variable control chart
c) Both can be used
d) None of the both types can be used
b) Variable control chart
c) Both can be used
d) None of the both types can be used