In a place, before the construction, CPT test was applied, the sand CPT Data is presented in Table 1. Ground water level
Posted: Tue Apr 26, 2022 1:41 pm
In a place, before the construction, CPT test was applied, the
sand CPT Data is presented in Table 1. Ground water level of the
region is at the 1-meter depth. You may Take πΎ=18 ππ/π3 πΎπ ππ‘=20
ππ/π3 πΎπ€ππ‘ππ =10 ππ/π3
ππππ‘Μ Μ Μ Μ Μ =160ππ/π2 , calculate the settlement of the square
foundation with B=3m (and L=3m) and Df=1m, using the Schmertmann
method in t = 4 years.
E = 2.5* qc
Table 1. CPT Data Depth (m) 4c (MPa) 0-2 4. 2-4 5 4-6 6 6- 8 7 8-10 8 10- 12 9
sand CPT Data is presented in Table 1. Ground water level of the
region is at the 1-meter depth. You may Take πΎ=18 ππ/π3 πΎπ ππ‘=20
ππ/π3 πΎπ€ππ‘ππ =10 ππ/π3
ππππ‘Μ Μ Μ Μ Μ =160ππ/π2 , calculate the settlement of the square
foundation with B=3m (and L=3m) and Df=1m, using the Schmertmann
method in t = 4 years.
E = 2.5* qc
Table 1. CPT Data Depth (m) 4c (MPa) 0-2 4. 2-4 5 4-6 6 6- 8 7 8-10 8 10- 12 9