The south super highway is design to have a roadway capacity of 150 vpm. But due to some resurfacing of the portion of t

Posted: Tue Apr 26, 2022 1:26 pm
by answerhappygod
The south super highway is design to have a roadway capacity of
150 vpm. But due to some resurfacing of the portion of the highway,
the roadway capacity was reduce to 25 vpm. The traffic arrival rate
is 55 vpm. The traffic then resume after 75 min. Compute the
maximum length of the queue, the average delay per vehicle due to
some resurfacing of the portion of the highway, and the longest
time any vehicle spent in the queue.