Page 1 of 1

For the Building details shown ,Prepare a quantity take off, bar bending schedul and Bill of quantities for the CONCRETE

Posted: Tue Apr 26, 2022 1:14 pm
by answerhappygod
For The Building Details Shown Prepare A Quantity Take Off Bar Bending Schedul And Bill Of Quantities For The Concrete 1
For The Building Details Shown Prepare A Quantity Take Off Bar Bending Schedul And Bill Of Quantities For The Concrete 1 (288.57 KiB) Viewed 43 times
For The Building Details Shown Prepare A Quantity Take Off Bar Bending Schedul And Bill Of Quantities For The Concrete 2
For The Building Details Shown Prepare A Quantity Take Off Bar Bending Schedul And Bill Of Quantities For The Concrete 2 (361.87 KiB) Viewed 43 times
please solve the probleme
For the Building details shown ,Prepare a quantity take off, bar bending schedul and Bill of quantities for the CONCRETE WORK. Assume all beams and slabs having the same reinforcement details as shown in the sections below 30 50 0 10.15 C2 3.0 Est 6.0 m 10.16 3.0 2.5, C9 03 CA X TO 15 2.5 3.0 m 4.0 06 C7 08 9.7 m 3.0 6.0 m _2 9.7m
3.0 5.0 to15 C2 ung 3.0L 3.0 Itse for tors CA tois X LUO' E 25 40 C6 07 08 19. m 3.0 6.0 m 0.7 9,7 m C6 25x75 cm Typical heam: 25x50 cm ODO 4012 2012 (MONTAGE) One To8.25 08020 u ONDO Columns 25x25 cm ON10 CICO 4 OSES 2013