In a safety stock problem where both demand and lead time are variable, demand average 120 units per year with a monthly
Posted: Tue Apr 26, 2022 12:56 pm
In a safety stock problem where both demand and lead time are
variable, demand average 120 units per year with a monthly standard
deviation of 4, and lead time average 3 month with a variance of 3
month. considering the service level of 97.5% what is the safety
stock?
a. 21.166
b. 60.348
c. 79.567
d. 210.190
e. 71.485
variable, demand average 120 units per year with a monthly standard
deviation of 4, and lead time average 3 month with a variance of 3
month. considering the service level of 97.5% what is the safety
stock?
a. 21.166
b. 60.348
c. 79.567
d. 210.190
e. 71.485