Page 1 of 1

The required resources for communication between end systems are reserved for the duration of the session between end sy

Posted: Thu Jul 14, 2022 8:01 am
by answerhappygod
a) Packet switching
b) Circuit switching
c) Line switching
d) Frequency switching